COUNTY OF SAN MATEO

Inter-Departmental Correspondence

Department of Public Works

 

DATE:

June 5, 2002

   

BOARD MEETING DATE:

June 25, 2002

   
 

TO:

Honorable Board of Supervisors

FROM:

Neil R. Cullen, Director of Public Works

SUBJECT:

The Resurfacing of Various Streets in the Polhemus Road Area (Project No. R8R01, F-36[71F])

   
 

Recommendation

Adopt a resolution awarding and authorizing execution of a Contract for the Resurfacing of Various Streets in the Polhemus Road Area.

 

Previous Board Action

Adopted Resolution No. 65223 on April 30, 2002, adopting Plans and Specifications, determining prevailing wage scales and calling for sealed proposals for the above-mentioned project.

 

Discussion

On Tuesday, May 28, 2002, bids were accepted for this project and subsequently referred to this office for checking and recommendation. The bids have been checked and the bid of:

 

G. Bortolotto & Co., Inc.

580 Bragato Road

San Carlos, California 94070-6227

 

at $528,686.55 was the lowest bid received.

 

The Engineer's estimate was $565,000. A summary of the bids received is as follows:

 
 

1.

G. Bortolotto & Co., Inc.

$528,686.55

 

2.

Duran & Venables, Inc.

$534,979.50

 

3.

Redgwick Construction Company

$535,990.50

 

4.

C.F. Archibald Paving, Inc.

$542,125.00

 

5.

O'Grady Paving, Inc.

$550,333.50

 

6.

McGuire & Hester Construction Company

$568,895.00

 

7.

Granite Rock dba Pavex Construction Division

$569,703.00

 

8.

Interstate Grading & Paving, Inc.

$582,192.50

 

9.

J.A. Gonsalves & Son Construction, Inc.

$717,405.00

 

We have reviewed the Contract documents and have determined that the Affirmative Action program submitted by G. Bortolotto & Co., Inc. is in accordance with the current Affirmative Action Guidelines.

 

Vision Alignment

We believe our recommendation is consistent with the Shared Commitment to "ensure basic health and safety for all" and Goal Number 7, "maintain and enhance public safety of all residents and visitors," as it will improve the conditions of the road surface for the benefit of the public.

 

Fiscal Impact

The total estimated cost of construction and contingencies is $581,000, which includes a ten percent (10%) contingency as the work is bid on a unit price basis (i.e., ton of asphalt placed, square yard of pavement fabric, etc.). The contingency is used to pay the contractor for any additional material placed as the actual tonnage used depends on the unit weight of the asphalt and the tolerances for the actual thickness of the pavement placed.

 

Funds have been appropriated in the Road Fund to finance this work. There is no impact to the General Fund.

 

A form of Resolution has been approved by the County Counsel