Bid packages were advertised and bid by the County in full compliance with the Public Contract Code. Bids were received October 14, 2004, and have been reviewed by the construction manager and the County. The basis of award is the base bid. The award amount is the base bid plus accepted alternates. The bid results are listed in Exhibit A. It is recommended to accept and assign the following bids to Turner:
• Roger Bowers Construction, Bid Package 15, Wood Framing
• Guarantee Glass, Bid Package 23, Window Systems/Glazing
• BBI Construction, Bid Package 30, General Requirements
• ISEC, Bid Package 35, Architectural Trades
The Assignment of Bid forms have been signed by Turner and the contractors.
Revision Order 13 also revises the contract with Turner Construction Company. Under the original Agreement, the fee payable to the Construction Manager for services during the construction phase was based on the construction cost. This revision order revises the Agreement to set a maximum fee of $2,856,474. Under the original Agreement, the contingency available to the Construction Manager during the construction phase was based on the construction cost. Revision Order 13 revises the maximum available contingency and the distribution of savings clause.
|