County of San Mateo

Environmental Services Agency

Planning and Building Division

 

FIRE MARSHAL FEE SCHEDULE

 

As Established by Board of Supervisors Resolution No. ____________

Adopted _________________

Effective __________________

 
 

CDF/SAN MATEO COUNTY FIRE PERMIT FEES

         
 

1.

Residential Plan Review (New Construction)

$0.44 per sq. ft.

         
 

2.

Residential Plan Review (Additions)

$0.44 per sq. ft.

         
 

3.

Residential Plan Review (Alterations)

See Schedule

         
 

Valuation Schedule – Alteration, Repairs, Interior Changes

   
 

Building Valuation Date Standards are published by ICBO Standards. Construction cost is adjusted by Regional Modifiers. San Mateo County uses Western U.S. (California – San Francisco Area).

   
 

Minimum Fees: $86.00 (includes the first $ of valuation).

   
 

$3,000 - $100,000

   

Valuation
At Or Above
$

Permit
Fee
$

Valuation
At Or Above
(In $1,000)
$

Permit
Fee
$

Valuation
At Or Above
(In $1,000)
$

Permit
Fee
$

Valuation
At Or Above
(In $1,000)
$

Permit
Fee
$

       

26

482

51

802

76

1,005

       

27

496

52

809

77

1,012

3,000

 

99

 

28

510

53

812

78

1,024

4,000

 

115

 

29

521

54

817

79

1,029

5,000

 

135

 

30

533

55

826

80

1,039

6,000

 

151

 

31

547

56

836

81

1,046

7,000

 

172

 

32

559

57

845

82

1,055

8,000

 

186

 

33

573

58

852

83

1,062

9,000

 

205

 

34

583

59

861

84

1,072

10,000

 

220

 

35

597

60

871

85

1,077

11,000

 

238

 

36

609

61

878

86

1,090

12,000

 

253

 

37

623

62

885

87

1,097

13,000

 

269

 

38

633

63

895

88

1,103

14,000

 

286

 

39

649

64

904

89

1,109

15,000

 

302

 

40

659

65

909

90

1,124

16,000

 

323

 

41

671

66

920

91

1,131

17,000

 

337

 

42

684

67

930

92

1,138

18,000

 

354

 

43

697

68

937

93

1,143

19,000

 

370

 

44

711

69

944

94

1,157

20,000

 

389

 

45

722

70

954

95

1,164

21,000

 

404

 

46

736

71

961

96

1,171

22,000

 

422

 

47

739

72

970

97

1,178

23,000

 

435

 

48

760

73

979

98

1,192

24,000

 

456

 

49

772

74

989

99

1,197

25,000

 

470

 

50

786

75

994

100

1,206

 

$100,000 - $499,000

   
 

$1,241.00 for the first $1,000,000 plus $8.61 for each $1,000 or fraction and including $499,000

   
 

$500,000 and up

   
 

$3,812.00 for the first $500,000 plus $8.60 for each fraction thereof.

       
 

4.

Accessory/Agricultural Buildings

$0.44

 
         
 

5.

Automatic Fire Sprinkler Systems (New)

$0.18

 
   

(includes one hour of plan review time, four hours of inspection time, and three hours of travel time)

   
         
 

6.

Automatic Fire Alarm Systems (New)

$599.00

 
   

(includes two hours of plan review, two hours of rough-in inspection, one hour final inspection and two hours of travel time)

   
         
 

7.

Automatic Fire Protection Systems (Hood and Duct)

$258.00

 
   

(includes on hour of plan review, one hour of inspection, and one hour of travel time)

   
         
 

8.

Compressed Gasses/Liquid Petroleum Gas

$258.00

 
   

(includes one hour plan check, one hour inspection and one hour travel time)

   
         
 

9.

Aboveground Flammable or Combustible Liquid Storage

$258.00

 
   

(includes one hour plan check, one hour inspection and one hour travel time)

   
         
 

10.

Fire Inspection/Reinspection Fee (Minimum)

$171.00/hour

 
     

$86.00 each additional hour

 
     

$129.00/hour - after hours

 
         
 

Planning Service Fee Schedule

   
         
 

11.

Plan Review Fee

$173.00

 
         
 

12.

Land Division

   
     

First 4 lots

$199.00

 
     

Each additional 4 lots

$199.00