COUNTY OF SAN MATEO Inter-Departmental Correspondence | ||||||
Department of Public Works | ||||||
DATE: |
June 3, 2005 | |||||
BOARD MEETING DATE: |
June 21, 2005 | |||||
SPECIAL NOTICE/HEARING: |
None | |||||
VOTE REQUIRED: |
Majority | |||||
TO: |
Honorable Board of Supervisors | |||||
FROM: |
Neil R. Cullen, Director of Public Works | |||||
SUBJECT: |
Anderson Bridge Railing Repair Project – Pescadero Creek Road – Loma Mar Area (Project No. R3V00, F-193 [10F]) | |||||
Recommendation | ||||||
Adopt a resolution awarding and authorizing execution of a contract for the above referenced project. | ||||||
Vision Alignment | ||||||
Commitment: Ensure the basic health and safety for all. | ||||||
Goal 7: Maintain and enhance the public safety of all residents and visitors. | ||||||
The proposed project will replace the temporary railing with a permanent railing and return the bridge to its historic appearance. | ||||||
Background | ||||||
Previous Board Action | ||||||
Adopted Resolution No. 67297 on May 3, 2005, which adopted plans and specifications, determined prevailing wage scales and called for sealed proposals for the above-mentioned project. | ||||||
History | ||||||
Bids for the project were accepted on May 24, 2005, and subsequently referred to this office for checking and recommendation. | ||||||
Discussion | ||||||
The bids have been checked and the bid of: | ||||||
George Bianchi Construction Inc. | ||||||
775A Mabury Road | ||||||
San Jose, CA 95133 | ||||||
at $137,975.52 was the lowest bid received. | ||||||
The Engineer’s estimate was $145,000.00. A summary of the bids received is as follows: | ||||||
1. |
George Bianchi Construction Inc. |
$137,975.52 |
||||
2. |
Berkeley Engineering Co. |
$144,180.00 |
||||
3. |
Valentine Corp. |
$148,369.00 |
||||
4. |
Bugler Construction, Inc. |
$149,718.00 |
||||
We have reviewed the contract documents and have determined that the Equal Employment Opportunity (Affirmative Action Program) (EEOP/AA) submitted by George Bianchi Construction Inc. is in accordance with the current EEOP/AA Guidelines. | ||||||
A form of resolution has been approved by County Counsel. | ||||||
Fiscal Impact | ||||||
The total estimated cost of construction is $151,500 which includes a ten percent (10%) contingency (approximately $ 13,525) as the work is bid on a unit price basis (i.e., linear feet of Concrete Barrier Railing and Post installed, etc.). The contingency is used to pay the contractor for any additional material placed for the various bid items, as the quantities paid for are based on the field measured quantities actually used/installed in conjunction with the project. | ||||||
Funds have been appropriated in the Road Fund to finance this work. | ||||||
There is no impact to the General Fund. |