RESOLUTION NO. _____________

BOARD OF SUPERVISORS, COUNTY OF SAN MATEO, STATE OF CALIFORNIA

* * * * * *

RESOLUTION ACCEPTING THE FACILITIES PLAN FOR THE PESCADERO COMMUNITY SEWER PROJECT AND DESIGNATING WASTEWATER TREATMENT PLANT (WWTP) SITE 3 AND A CONVENTIONAL GRAVITY COLLECTION SYSTEM AS THE PREFERRED ALTERNATIVE FOR THE ENVIRONMENTAL ASSESSMENT

______________________________________________________________

RESOLVED, by the Board of Supervisors of the County of San Mateo, State of California, that

 

WHEREAS, this Board of Supervisors authorized the Department of Public Works to serve as lead agency in the application and acceptance of a grant from the State Water Resources Control Board to perform a feasibility study for installing a sanitary sewer system in the community of Pescadero.

 

WHEREAS, Hydroscience Engineers, Inc. was selected to provide engineering services in connection with said feasibility study for a sanitary sewer system in the community of Pescadero; and

 

WHEREAS, Hydroscience Engineers, Inc. has produced a draft feasibility study titled, “Pescadero Community Sewer Project, Facilities Planning Report,” dated June 2008; and

 

WHEREAS, the San Mateo County Department of Public Works has reviewed the draft feasibility study and determined the site located on the hillside south-east of the Pescadero Corporation Yard, identified as Wastewater Treatment Plant Site 3 in the Facilities Planning Report, to be the most appropriate site for locating a new wastewater treatment plant:

 

NOW THEREFORE, IT IS HEREBY DETERMINED AND ORDERED that:

 

1.

The Facilities Plan for the Pescadero Community Sewer Project is accepted; and

 

2.

The proposed wastewater treatment plant site located on the hillside southeast of the Pescadero Corporation Yard, and identified as Wastewater Treatment Plant Site 3 in the draft Facilities Planning Report, and the conventional gravity sewer collection system, is hereby designated as the preferred alternative for environmental assessment.

* * * * * *