COUNTY OF SAN MATEO

Inter-Departmental Correspondence

Sheriff’s Office

 

DATE:

June 14, 2010

BOARD MEETING DATE:

June 29, 2010

SPECIAL NOTICE/HEARING:

None

VOTE REQUIRED:

Majority

 

TO:

Honorable Board of Supervisors

FROM:

Sheriff Greg Munks

SUBJECT:

Executive Summary: Pre-architectural Program for the Replacement Jail Facility

 

RECOMMENDATION:

    A.

Accept the Pre-architectural Program prepared by Liebert & Associates, and the Jail Planning Unit.

    B.

Provide direction on construction phasing and staffing options.

 

BACKGROUND:

The Board of Supervisors authorized the preparation of a comprehensive Pre-architectural Program (see attachment) as a step towards replacement of the Maple Street Correctional Facilities. In January 2009, Dennis Liebert and Roger Lichtman were retained to assist the County with developing a Pre-architectural Program. The Pre-architectural Program was developed through a series of meetings with representatives from the Sheriff’s Office as well as other County departments and community based organizations. The recommended scenario for planning is to build to the baseline need, project future growth and concurrently implement jail population management strategies.

 

DISCUSSION:

The Pre-architectural Program includes operational functions for each area in the replacement facility and adjacency diagrams. It details secure housing for 680 inmates plus 88 non-secure Transitional Housing, for a total of 768 male and female beds. It should be noted that 472 beds of the total additional beds are necessary to meet current need and relieve constant endemic overcrowding in our system.

The proposed facility will consist of 6 floors, with inmate housing located on the 4th, 5th and 6th floors. Structural transfer and mechanical areas will be located on the 3rd floor. Staff support, public area, kitchen and administration will be on the ground and 2nd floors. The Transitional Housing area will be outside the secure perimeter with a separate entrance. This area will provide 88 male and female inmates’ opportunities to participate in programs such as Transitioning Animals into Loving Situations (TAILS), culinary cooking classes, family reunification, vocational training, re-entry, and mentorship assignment.

The Pre-architectural Program also includes other functional areas that will be needed in the replacement facility including Processing, Transport, Medical/Mental Health Clinic, Public Lobby, Video Visitation, Facility Administration, Staff Support, Master Control, Support Services and Food Services.

The Marshall Associates, Inc. was retained to provide an evaluation of the existing Maguire Correctional Facility (MCF) kitchen. The existing kitchen was built in 1988 and expanded/remodeled in 1994. It was designed to serve 680 inmates but now serves approximately 1200 meals, 3 times a day, 7 days a week, plus staff meals. Approximately 3,700 total meals are served on a daily basis and 1.3 million annually. The MCF kitchen equipment will need to be replaced within five years; requiring partial closure. It is recommended that one central kitchen be built in the new facility to serve MCF and the replacement jail facility. The proposed kitchen would be designed to include a culinary vocational training school for inmates as part of the re-entry program.

The replacement facility includes 154,883 net square feet and 254,740 gross square feet, representing 331 square feet per inmate for capacity of 768, complying with California Standards Authority (CSA) minimum space requirements.

The number of staff necessary to operate a jail is dependent on actual design and should be revisited throughout the design process. The staffing recommendation is based utilizing a combination of sworn and civilian positions and on all housing units being occupied. A total of 145 positions will be required to operate the replacement facility. Of the 145 positions needed, 75 positions already exist in the Sheriff’s Office for reassignment based on the closure of the Maple Street Correctional Facilities.

A phasing option for construction consideration would be to “shell” or partially complete one floor, reducing the housing floors from 3 to 2. By partially completing one housing floor, 256 male inmate beds would be eliminated, reducing the inmate bed count from 768 to 512. The proposed 768 bed facility would cost approximately $150 to $160 million to construct. By partially completing one housing floor, construction costs could be reduced by approximately $14 million. It should be noted that the cost to add back the 256 beds at a later date into the “shelled” space would cost approximately $28 million in F/Y 2010-11 dollars. The staffing need could also be reduced from 145 sworn staff to 125, with an annual savings of $4.3 million.

Approval of this Pre-architectural program contributes to the Shared Vision 2025 outcome of a Collaborative Community by ensuring a safe and cost effective Replacement Jail facility.

 

FISCAL IMPACT:

Staff costs are in FY 2010-11 dollars and do not include service charges (medical/ food/ ISD/ DPW rent). Approximately $32 million for 145 sworn and civilian positions would be needed to operate the new facility. Of the 145 positions, 75 already exist offsetting the $32 million by an estimated $15 million for a net county cost of $17 million using FY 2010-11 dollars.

Estimated total approximate costing is listed in the chart below. Once a final jail replacement site is approved, an updated total costing will be conducted.

ATTACHMENT A - Pre-architectural Program

ATTACHMENT B - ADP and Bed Need Matrix

ATTACHMENT C - ADP and Bed Need Matrix (partial completion)