Groundwater Protection Program Corrective Action Guidelines, Policies and Procedures
A few new topic-specific guidelines have been developed to provide more up-to-date guidance for responsible parties and consultants. You can view these guidelines by clicking on the appropriate link. For other issues please refer to the guidance document below and/or your case manager at (650) 372-6200.
- site conceptual model [PDF]
- conduit study [PDF]
- sensitive receptor survey [PDF]
- subsurface vapor sampling for human health risk evaluation [PDF]
- closure summary [PDF]
- Environmental Health Soil Reuse Guidelines [PDF]
Introduction
Section I - Corrective Action Guidelines
- Report Submittal Schedule
- Transmittal Letter
- Containment Zone Policy
- Notification Requirements
- Administrative Requirements
- Objective of the Preliminary Site Assessment
- Conditions Which Require a Preliminary Site Assessment
- Preliminary Site Assessment Workplan
- Preliminary Site Assessment Reports
- Objective of Remedial Investigation
- Remedial Investigation Workplan
- Remedial Investigation Reports
- Soil Excavation
- Liquid Plume Control
- Reportings
Evaluation of Risk
Feasibility Study
- Feasibility Study Workplan
- Feasibility Study Report
- Alternative Cleanup Standards
- Remedial Action Workplan
- Remedial Action Report
- Case Closure Request
- Closure Document Preparation
- Residual Contaminant Management
- Destruction of Monitoring Wells
- Closure Documentation
References
Section II - Policies and Procedures
Permitting of Subsurface Drilling Activities
Rationale For Use of No Purge Alternative
Labeling of Drums
Signature Requirement for Technical Reports
Request for Statement of Qualifications
How to Apply for a USEPA Identification Number
Required Notification for Field Activities
Underground Storage Tank Cleanup Fund
Appendix A - 23CCR Corrective Action Regulations
Appendix B - Site-Specific Sampling Plans
Appendix C - Recommended Minimum Verification Analyses for Leaking USTs
Appendix D - SWRCB Containment Zone Policy
Appendix E - SF RWQCB Interim Guidance Document
Appendix F - Natural Attenuation of Petroleum Hydrocarbons
Appendix G - Recommended Format for Case Closure Summary
Appendix H - Forms and Sample Documents
re"fc
skip to main content
E-Subscribe


