Case Number:  BLD2007-01308      Status:   Finaled
Name: KASRA ARAGHI
Application Date: 12/21/2007
Address: 2304 BUNKER HILL DR
Description: SFD - existing house to be demolished, attached 3 car garage,5 bdrms, 4 bath, one wood fire burning fireplace replacing one in the existing house. Resubmittal #1CZN 5/14/08 revised foundation plans per the geo requiremnets. Resubmittal #2CZN 8/4/08 grading and drainage plans and letter for JFD from Murray engineers. RESUBMITTAL # 3 - PVT - 10/14/08 Per FIRE CDF comments of 01/23/08 re: note F.S. system, smoke detectors, address, chimney spark arrestor.

Activities
Type  Requested  Scheduled  Completed  Status  Done By 
Receive application      12/21/2007    CZN 
 
FEMA FLOOD ZONE CHECK  12/21/2007    5/14/2008  DONE  MAR 
Zone C 
*Rule 4(d) ChecklistCompliance  12/21/2007    5/14/2008  DONE  MAR 
No impact. 
**FINAL**AntiEntrapment Device      4/9/2010  DONE  PVT 
no pool - affidavit on file 
Review by Planning  12/21/2007    3/12/2008  DONE  JAC 
3/12/2008 JAC: No planning issues. 12/21/07 JXC - Routed to James. 12/21/07 - MAN - Submit at Risk. Route for random plan check. Setbacks, height, min. garage dimensions are all met. Double check lot coverage. architect stated that the balcony is not included in the 2nd floor sq ftg 
(F) Print application form      12/21/2007  DONE  CZN 
 
Review by Public Works  12/21/2007  12/21/2007  10/3/2008  DONE  RKL 
1-30-08 RKL-sent Plan Review Notice (see document) to applicant. 12-2107 RKL-sent plans out for presite inspection and sewer comments, separately. 
Fire Sprinker Plans Issued      12/12/2008  DONE  JPB 
cdf 
Fire Sprinker Plan Approval  12/21/2007  12/21/2007  9/11/2008  DONE  MAC 
 
Review by Geotechnical  12/21/2007    8/26/2008  DONE  JLM 
Resubmittal #1CZN 5/14/08 revised foundation plans per the geo requiremnets. 01-23-2008 JLM File No. 9E-167. Sent review sheet this date, waiting for response from geotechnical consultant (Murray Engineers). 04-01-2008 JLM Sent additional review sheet this date. 6-12-2008 JFD - sent another review sheet this date 08-26-2008 JLM/JFD Geotechnical consultant to observe and approve all applicable work. 
Review by Fire (CDF)  12/21/2007    10/22/2008  DONE  MAC 
01/23/08 MPJ: hydrant location not shown on plans, need will serve letter frm water purveyor, plans lack fire notes re: auto FS system...see conditions. 
Review by other agency  12/21/2007    1/28/2009  DONE  RMM 
demo existing house 
Review by Building  12/21/2007    11/24/2008  DONE  SXC 
11/17/08 SYC- Sent comment letter to applicant. RESUBMITTAL # 3 - PVT - 10/14/08 Per FIRE CDF comments of 01/23/08 re: note F.S. system, smoke detectors, address, chimney spark arrestor. JPB - 08/08/08 - PLANS ON STEPHENS LIST. Resubmittal #2CZN 8/4/08 grading and drainage plans and letter for JFD from Murray engineers. Resubmittal #1CZN 5/14/08 revised foundation plans per the geo requiremnets. 
Sewer Verification Required  12/21/2007  8/19/2008  1/22/2009  DONE  BXV 
Final Submittal 1/16/09 BV x1443: 1. All sanitary sewer facilities shall be constructed per the approved plans and the standard details of the Sewer District. 2. The Sewer District has reviewed the video inspection of the existing sewer lateral performed by the applicant on 10/17/08. The Sewer District has determined, based on our review of the video inspection that the condition of the existing lateral, at the time of the video inspection, is acceptable for re-use. 3. Sewer Inspection Permits (SIP) must be obtained by the applicant or contractor for: a) the capping of the existing lateral prior to demolition of the existing building b) the inspection of Sewer District standard cleanout at the property line SIPs may be obtained from the Sewer District office at 555 County Center, 5th Floor, Redwood City. 4. The Sewer District office shall be contacted (363-4100) to schedule inspections. Inspections must be scheduled a minimum of one working day prior to the inspection. No inspections shall occur on Fridays, weekends and holidays unless special arrangements are made with the Sewer District. 5. Please be advised that the property owner is responsible for maintaining the sewer lateral and the connection to the sewer main. The Sewer District provides courtesy service for the section of lateral between the property line cleanout and the sewer main whenever a standard Sewer District cleanout exists. Fees and charges in the amount of $350 have been paid on 1/06/09. Second Submittal, 8/18/08 BV x1443: 1. The plans must show all relevant sewer lateral information including the size, material, length and slope. This information will be used by the Sewer District to verify whether or not the sewer lateral meets the current Sewer District standard. The sewer lateral between the property line cleanout and the sewer main shall be 4". 2. The Sewer District would approve the re-use of an existing sewer lateral if the applicant provides the Sewer District with evidence (i.e. closed circuit video camera inspection), prior to re-submittal of the revised plans, that the existing lateral between the property line cleanout and sewer main meets Sewer District standard and in acceptable condition and the lateral connection to the main is also acceptable. The existing lateral shall be removed and replaced at the property owner's expense if the Sewer District determines that the line is in poor condition or does not meet Sewer District standard. 3. A 4" Sewer District approved standard cleanout will be required at the property line or on private property within 5' of the property line. The size, rim, and invert elevation of the cleanout must be shown on the plans. 4. The plans must show relevant information for the existing Sewer District mains within the scope of the project including pipe size, material, and length. Rim and invert elevations for the upstream and downstream manholes nearest the proposed lateral connection point to the District main must also be shown. This information will be used by the Sewer District to verify the invert elevation at the lateral connection point and other design elements. 5. Sanitary sewer connection and testing must be made in the presence of a Sewer District representative. A note indicating this requirement shall be added to the plans. 6. All appropriate Sewer District standard details shall be included on the plans. Sewer District standard details can be found on our website at www.co.sanmateo.ca.us/sewers 7. The attached fees and charges are estimated based on the information contained in the submitted plans. Payment of all fees and charges shall be made to the County of San Mateo prior to final approval of the plans. 8. Sewer Inspection Permits (SIP) mus 
Water Verification Required  12/21/2007  12/21/2007  1/29/2009  DONE  PVT 
doc. from Cal Water on file - 1" meter for both fire & domestic 1" meter 
WASTE MANAGE PLAN SUBMITTED  12/21/2007    1/22/2009  DONE  CZN 
 
**FINAL** WASTE MANAGE PLAN   12/21/2007    6/10/2010  DONE  DMK 
 
School fees Required  12/21/2007  12/21/2007  1/29/2009  DONE  PVT 
 
School fees paid  12/21/2007  12/21/2007  1/29/2009  DONE  PVT 
doc. from San Mateo - Foster City school district on file 
DPW Encroachment Permit Reqd  12/21/2007    1/13/2009  DONE  RKL 
 
(F) Print Resubmittal Appl.      5/14/2008  DONE  CZN 
 
Resubmittal - Geotechnical  5/14/2008    8/26/2008  DONE  JLM 
Resubmittal #1CZN 5/14/08 revised foundation plans per the geo requiremnets. 08-26-2008 JLM/JFD Geotechnical consultant to observe and approve all applicable work. 
Resubmittal - Planning  5/14/2008    5/14/2008  DONE  MAR 
5/14/08 MAR - No planning issues. Resubmittal #1CZN 5/14/08 revised foundation plans per the geo requiremnets. 
(F) Print Resubmittal Appl.      8/4/2008  DONE  CZN 
Resubmittal #2CZN 8/4/08 grading and drainage plans and letter for JFD from Murray engineers. 
Resubmittal - Planning  8/4/2008    8/6/2008  DONE  JAC 
8/6/2008 JAC: No planning issues. 8/06/08 SSB - Routed to James. Resubmittal #2CZN 8/4/08 grading and drainage plans and letter for JFD from Murray engineers. 
Resubmittal - Public Works  8/4/2008    10/3/2008  DONE  RKL 
8-5-08 RKL-sent plans to County sewer district for review. Resubmittal #2CZN 8/4/08 grading and drainage plans and letter for JFD from Murray engineers. 
Resubmittal - Geotechnical  8/4/2008    8/26/2008  DONE  JLM 
Resubmittal #2CZN 8/4/08 grading and drainage plans and letter for JFD from Murray engineers. 08-26-2008 JLM/JFD Geotechnical consultant to observe and approve all applicable work. 
**FINAL** - Drainage  10/3/2008    3/24/2010  DONE  RKL 
3-23-10 RKL-the drainage system installed per approved plans except for the location of the energy dissipator box and two 3" PVC pipes through the curb which were moved closer to side property line (marked up on the plans). Onsite drainage requires Public Works inspection. 
**FINAL** - Public Works  10/3/2008    5/25/2010  DONE  RKL 
final, 5/24/10 msm. #358 two new driveways, sidewalk, drainage under sidewalk require Public Works inspection. 
Resubmittal - Planning  10/14/2008    10/17/2008  DONE  JAC 
10/18/2008 JAC: No planning issues. 10/15/2008 SSB - Routed to James to ensure no significant changes from previously approved plans. Submit @ risk - route to JAC RESUBMITTAL # 3 - PVT - 10/14/08 Per FIRE CDF comments of 01/23/08 re: note F.S. system, smoke detectors, address, chimney spark arrestor. 
Resubmittal - Fire  10/14/2008    10/22/2008  DONE  MAC 
RESUBMITTAL # 3 - PVT - 10/14/08 Per FIRE CDF comments of 01/23/08 re: note F.S. system, smoke detectors, address, chimney spark arrestor. 
(F) Print Resubmittal Appl.      10/14/2008  DONE  PVT 
 
**FINAL** - Fire  10/22/2008    5/20/2010  DONE  JJR 
 
(F) Send Owner Ready Notice      12/12/2008  DONE  JPB 
 
**FINAL** - Sewer  1/20/2009    1/22/2009  PEND  BXV 
SIP 4334 requires inspection BV x1443 
(F) Issue Permit      1/29/2009  DONE  PVT 
 
Foundation insp  3/30/2009  4/1/2009  4/1/2009  DONE  DMK 
PEND SURVEY AND GEO 
Zoning insp  4/2/2009  4/2/2009  4/2/2009  DONE  DMK 
 
Garage slab insp  4/15/2009  4/17/2009  4/17/2009  DONE  DFK 
Caller received Time Window on 04/17/2009;Scheduled by a contractor via Hello! on 04/15/2009 at 11:07:57. Contact: . 
Below Floor Gas Piping Inspec.  4/22/2009  4/24/2009  4/24/2009  CNCL  MJG 
4/24/2009 MJG I WAS TOLD BY THE PLUMBING CONTRACTOR THAT THE "GAS-PIPING" WOULD BE AN "OVER-HEAD" INSTALLATION. Caller received Time Window on 04/24/2009;Scheduled by a contractor via Hello! on 04/22/2009 at 15:48:25. Contact: . 
Below Floor Ducts  4/22/2009  4/24/2009  4/24/2009  DONE  MJG 
Caller received Time Window on 04/24/2009;Scheduled by a contractor via Hello! on 04/22/2009 at 15:49:10. Contact: . 
Below floor frame insp  4/22/2009  4/24/2009  4/24/2009  DONE  MJG 
4/24/2009 MJG I RECEIVED & FILED THE "ORIGINAL" SET-BACK & SURVEY LETTER; DATED: 4/01/2009. Caller received Time Window on 04/24/2009;Scheduled by a contractor via Hello! on 04/22/2009 at 15:49:58. Contact: . 
Below Floor DWV Inspection  4/22/2009  4/24/2009  4/24/2009  DONE  MJG 
Caller received Time Window on 04/24/2009;Scheduled by a contractor via Hello! on 04/22/2009 at 15:50:53. Contact: . 
Mud sill bolting insp  4/24/2009    4/24/2009  DONE  MJG 
 
H.D.S/straps insp  4/24/2009    4/24/2009  PART  MJG 
4/24/2009 MJG I INSPECTED THE "COLLARS / ALL-THREAD EXTENSIONS"; & VERIFICATION = OK TO PROCEED WITH INSTALLING THE NEW, "UNDERFLOOR INSULATION BATTS. 
Insulation insp - floor  4/27/2009  4/28/2009  4/28/2009  DONE  DMK 
Caller received Time Window on 04/28/2009;Scheduled by a contractor via Hello! on 04/27/2009 at 10:56:38. Contact: . 
Roof nail insp  6/24/2009  6/25/2009  6/25/2009  DONE  AFC 
Caller received Time Window on 06/25/2009;Scheduled by a contractor via Hello! on 06/24/2009 at 12:56:06. Contact: . 
H.D.S/straps insp  6/25/2009  6/29/2009    FAIL  DMK 
SEE LIST 
Exterior shear insp  6/29/2009  7/1/2009  7/1/2009  FAIL  DMK 
SEE LIST 
Interior shear insp  6/29/2009  7/1/2009  7/1/2009  FAIL  DMK 
SEE LIST 
Exterior shear insp  7/1/2009  7/2/2009  7/2/2009  DONE  MJG 
7/02/2009 MJG THIS INSPECTION COMPLETED THE EXISTING "CORRECTION NOTICES" ( 6/26/09 & 7/01/09 ) PER INSPECTOR DAVID KENNEY; & THEREFORE, VERIFICATION = OK TO PROCEED & TO COVER THE "EXTERIOR SHEAR". Caller received Time Window on 07/02/2009;Scheduled by a contractor via Hello! on 07/01/2009 at 13:55:09. Contact: . 
H.D.S/straps insp  7/2/2009    7/2/2009  DONE  MJG 
 
Above Floor DWV Inspection  9/18/2009  9/22/2009  9/23/2009  DONE  AFC 
Caller received Time Window on 09/22/2009;Scheduled by a contractor via Hello! on 09/18/2009 at 18:33:17. Contact: . 
Stucco wire insp  9/18/2009  9/22/2009  9/23/2009  DONE  AFC 
Caller received Time Window on 09/22/2009;Scheduled by a contractor via Hello! on 09/18/2009 at 18:34:19. Contact: . 
Water Piping Inspection  9/23/2009    9/23/2009  DONE  AFC 
 
Above Floor Electrical  10/1/2009  10/5/2009  10/5/2009  CNCL  MJG 
Caller received Time Window on 10/05/2009;Scheduled by a contractor via Hello! on 10/01/2009 at 14:16:22. Contact: . 
Above Floor Electrical  10/5/2009  10/8/2009  10/8/2009  DONE  DFK 
Caller received Time Window on 10/08/2009;$$$$$ ... CONTRACTOR REQUESTS "EARLY A.M." ... $$$$$$ Scheduled by a contractor via Hello! on 10/05/2009 at 15:47:04. Contact: . 
Above Floor Ducts  10/5/2009  10/8/2009  10/8/2009  DONE  DFK 
Caller received Time Window on 10/08/2009;$$$$$$ ... CONTRACTOR REQUESTS "EARLY-A.M." ... $$$$$$ Scheduled by a contractor via Hello! on 10/05/2009 at 15:48:24. Contact: . 
Interior shear insp  10/26/2009  10/27/2009  10/27/2009  CNCL  MJG 
Scheduled by a contractor via Hello! on 10/26/2009 at 14:13:01. Contact: . 
Kitchen Fan Duct  10/27/2009    10/27/2009  DONE  MJG 
 
Bathroom Fan Duct(s)  10/27/2009    10/27/2009  DONE  MJG 
 
Flues  10/27/2009    10/27/2009  DONE  MJG 
 
Fireplace (Factory)  10/27/2009    10/27/2009  DONE  MJG 
 
Above floor frame insp  10/27/2009  10/30/2009  10/30/2009  FAIL  DMK 
SEE LIST 
Interior shear insp  10/30/2009    10/30/2009  DONE  DMK 
 
Water Line Connection  11/4/2009  11/5/2009  11/5/2009  DONE  DMK 
Scheduled by a contractor via Hello! on 11/04/2009 at 10:02:14. Contact: . 
Above floor frame insp  11/13/2009    11/13/2009  DONE  DMK 
 
Interior shear insp  11/13/2009    11/13/2009  DONE  DMK 
 
Insulation insp - walls  11/18/2009  11/20/2009  11/20/2009  DONE  MJG 
Caller received Time Window on 11/20/2009;Scheduled by a contractor via Hello! on 11/18/2009 at 16:41:21. Contact: . 
Insulation insp - ceiling  11/18/2009  11/20/2009  11/20/2009  DONE  MJG 
Caller received Time Window on 11/20/2009;Scheduled by a contractor via Hello! on 11/18/2009 at 16:42:06. Contact: . 
ABOVE FLOOR COMBINATION INSP.  11/20/2009  11/20/2009  11/20/2009  DONE  MJG 
 
Below Floor Electrical  11/20/2009    11/20/2009  DONE  MJG 
 
Furnace  11/20/2009    11/20/2009  DONE  MJG 
 
Above floor frame insp  11/20/2009    11/20/2009  DONE  MJG 
 
Interior shear insp  11/20/2009    11/20/2009  DONE  MJG 
 
Insulation insp - piping  11/20/2009    11/20/2009  DONE  MJG 
 
Gypsum nail insp  11/30/2009  12/1/2009  12/1/2009  CNCL  DMK 
Caller received Time Window on 12/01/2009;12/1/09 AFC - Want late afternoon inspection Scheduled by a contractor via Hello! on 11/30/2009 at 11:54:12. Contact: . 
Gypsum nail insp  12/2/2009  12/3/2009  12/3/2009  DONE  MJG 
Caller received Time Window on 12/03/2009;Scheduled by a contractor via Hello! on 12/02/2009 at 08:54:37. Contact: . 
Gas tag/test insp  12/3/2009    12/3/2009  DONE  MJG 
 
Shower Pan Inspection  12/10/2009  12/11/2009  12/11/2009  CNCL  DFK 
Caller received Time Window on 12/11/2009;### Requesting AM Inspection ### Scheduled by a contractor via Hello! on 12/10/2009 at 14:25:04. Contact: . 
Shower Pan Inspection  12/16/2009  12/17/2009  12/17/2009  DONE  DFK 
Caller received Time Window on 12/17/2009;######CUST REQUESTING EARLIEST AM INSP TIME#### Scheduled by a contractor via Hello! on 12/16/2009 at 13:45:53. Contact: . 
Underground Utilities  1/31/2010  2/3/2010  2/3/2010  FAIL  DMK 
NOT UNDER TEST AND CANNOT RUN THROUGH FOUNDATION VENT 
Underground Utilities  2/4/2010  2/8/2010  2/8/2010  DONE  DMK 
Scheduled by a contractor via Hello! on 02/04/2010 at 23:23:46. Contact: . 
Final inspection  3/29/2010    3/29/2010  PEND  MJG 
3/29/2010 MJG NO PLANNING APPROVAL REQUIRED ... BUT THE FOLLOWING DEPARTMENTS DO REQUIRE FINALS: ANTI ENTRAPMENT ... FIRE ... PUBLIC WORKS ... WASTE MGMT.  
**FINAL** - Water  4/5/2010    4/5/2010  DONE  CZN 
 
Final inspection  4/30/2010  5/3/2010  5/3/2010  FAIL  DMK 
Disp set to [FAIL] by DMK via Hello! on 05/03/2010 at 13:34:39.;Caller received Time Window on 05/03/10:08:36:35;;Scheduled by a contractor via Hello! on 04/30/2010 at 09:11:09. Contact: . see list 
**FINAL** - Geotechnical  5/3/2010    5/19/2010  DONE  JLM 
 
Final inspection  5/24/2010  5/26/2010  5/27/2010  PEND  DFK 
5/26/10 DFK. PROJECT COMPLETE. ALL OK TO FINAL PENDING RECEIPT OF THE WASTE MANAGEMENT FINAL APPROVAL. ############## requesting late afternoon. ############# Scheduled by a contractor via Hello! on 05/24/2010 at 10:08:33. Contact: . 
Final approval (Status=F)      6/10/2010  DONE  DMK 
 
Final inspection  6/10/2010    6/10/2010  DONE  DMK 
 
(F) Issue Final C Of O      6/10/2010  DONE  MTP 
 

Fees   
Item  Fee Amount  Fee Remaining 
Plan Check Review Fee  7,548.42  0.00 
BUILDING PERMIT FEE  6,688.00  0.00 
Road Mitigation Fee  4,173.40  0.00 
Geotech Fee  2,656.00  0.00 
Fire CDF Fee  2,136.64  0.00 
Electrical Fee  1,831.76  0.00 
Mechanical Fee  1,588.40  0.00 
Plumbing Fee  1,504.80  0.00 
5% Legal Counsel Surcharge Fee  1,110.12  0.00 
Minor Encroachment Fee  475.00  0.00 
Dept. of Public Works Review  400.00  0.00 
Stormwater Pollution Fee  258.00  0.00 
Energy Code Compliance Fee  141.00  0.00 
GEO Consulting Fee  136.00  0.00 
Microfilm Fee  130.00  0.00 
Filing Fee  29.00  0.00 
Temporary Power Pole Fee  0.00  0.00 
Road Escrow Deposit  0.00  0.00 

Conditions
Title Id Tag Status
Statement/Sprinklers (Fire) 0004:1    Unmet
Sprinkler System - Family (Fire) 0006:2    Unmet
Waterflow Alarm - Res. (Fire) 0009:2    Unmet
Fire Sprinkler Conditions (Fire) 0012:2    Unmet
Fire Flow (Fire) 0041:1    Unmet
Public Water Certification (Fire) 2080:1    Unmet
Smoke Detection (Fire) 0018:1    Unmet
Roof Assembly (Fire) 0020:1    Unmet
Address (Fire) 0021:1    Unmet
General Fire Safety (Fire) 0027:1    Unmet
Final (Fire) 2270:1    Unmet

 